Page 32 - Layout 1
P. 32

RV0322.qxp_Layout 1  3/2/22  7:07 PM  Page 30





                                         Project Update continued





              • It is highly recommended that all residents that must use  The City and Contractor have committed to regular
              their boats should make plans to relocate them for the length  communication to impacted residents and the general public
              of the dredging project.                              both before and during the execution of the projects and
                                                                    plans to notify impacted residents along the river of the
              • During days of where the contractor will not be performing
              dredging activities, the contractor will temporarily remove the  details and scope of the project.
              floating turbidity and closure booms to allow boat traffic.  For Rio Vista residents, you can expect some of the following
                                                                    inconveniences during the span of the project:
              • During days where dredging activities are being performed,
              the Contractor will not honor requests to stop work activities to  - Heavy noise from the use of on-water hydraulic dredging
              allow boats through and around the work area, and there will  and operating equipment during the working hours of the
              be no work stoppage for boats that do not comply with this  day (expected to be between 8am to 5pm).
              guidance. These instructions include Monday mornings when  - Some foul air or odor as a result of the excavation and
              dredging activity will commence after weekend suspension  disturbance of metals and soils from the riverbed.
              and the waterway will be closed back off.
                                                                     - Some level of turbidity in the water; the Contractor will
              • In certain situations, residents could be forced to store boats
                                                                     monitor the level of turbidity during the project and adjust
              from Mondays until the prospective Friday afternoon when the
                                                                     work activities accordingly.
              Tarpon River is opened back up for the weekend. Again, it is
              highly recommended that all residents with boats at or near  - Increased traffic during the beginning and ending hours of
              the location of the planned work make plans to move and  the workday as a result of arrival and departure of project
              store their boat to avoid damage to their vessels.     and contractor work staff. RV