Page 10 - TLBC0423
P. 10

LRA Neighborhood Update

                                 Committee                             REPORTS





             Parks and Recreation                                   Security

             The Parks and Recreation Department has completed the   There have been several crime events within The Landings
             installation of the four additional wall lights at the Federal   in recent days. Thanks to information provided by private
             and NE 55th Street monument. These lights are not only   cameras, we are hopeful that the FLPD will be able to match
             decorative, but also provide much needed illumination behind   the privately collected information with that gathered by the
             the entrance wall and curved roadway.                  LPR Cameras.

             FP&L continues with their city-wide replacement of the halogen   Please keep in mind that the LPR Cameras are wireless-dependent
             street lights with new LED lighting. We are anticipating FP&L   devices and technology does fail. Thus, we encourage everyone
             will commence with the change-out of The Landings street   who is not placing their vehicles in their garage to remove any
             lights in the April/May time frame.                    items from within their vehicles, lock it securely and keep the areas
                                                                    well-lit where the vehicles are parked.
             The Parks and Recreation Department has secured/installed
             Mr. Martin Zidtowecki as the new “Urban Landscape      The FLPD does monitor the LPR Cameras on a regular basis
             Designer” for the City of Fort Lauderdale. He will be   and If a camera goes off-line, they issue a repair order to the
             addressing the citywide medians and public spaces and   vendor immediately. While repairs are a challenge, the parties
             will develop design themes that are appropriate for the   continue to monitor and try to expedite repairs where possible.
             various locations. The Landings was selected as one of the
             first pilot projects for his department. Representatives from   General Area Updates
             the community met with Marty two weeks ago and initial   Bayview Drive Mobility Project – The Transportation & Mobility
             “possible concepts” were discussed and are being reviewed   Department is managing a project on Bayview Drive just south
             by the department. We are expecting to receive initial   of The Landings to add sidewalks where they are missing and
             conceptual sketches by the first of April. Thereafter, the design   traffic calming between Commercial Blvd and Sunrise Blvd.
             and budgets will be developed/finalized to facilitate the   The project started construction the week of April 25, 2022.
             improvements and commence work. The work will be done in   The project will be completed in May 2023. Sidewalks are
             phases, with the first phase being the Bayview Drive medians.  being completed now and the remaining traffic calming will
             Public Works                                           be the focus over the next 2-3 months.

             Public Works Department has been advised of the graffiti   Commercial Boulevard Resurfacing Project – The Florida
                                                                    Department of Transportation is in design of a resurfacing
             that is present under the Bayview Drive Longboat Inlet (flat)   project on Commercial Boulevard between Powerline
             Bridge. We have been advised that the graffiti is scheduled for   Road and the Intracoastal bridge. The project will mainly
             removal (abutments repainted) by the first of April.   be repaving; however, they will be adding a signalized
             The pre-construction meeting between the city and their contractor   pedestrian crossing at NE 26th Avenue. It is anticipated
             for Bayview Drive Longboat Inlet (flat) Bridge abutment structural   that public engagement will happen in summer 2023 once
             repairs was held on 3/16/2023. The construction repairs were   the preliminary plans have been completed. Construction is
             expected to have commenced on 3/20/2023.               anticipated to begin in late 2024/early 2025.
             The existing Bayview Drive Longboat Inlet (flat) Bridge is   US 1 Resurfacing Project (Commercial Blvd to Pompano
             scheduled for redesign in 2023 and a new replacement   Beach) – The Florida Department of Transportation is in the
             bridge is planned for 2024. We have requested the city   preliminary stages of a future resurfacing project on US 1
             provide us with an expected date for a meeting with the city’s   (N. Federal Hwy.) from Commercial Blvd north into Pompano
             consultants, so as to allow for community input as to design,   Beach. The project will be mainly repaving; however, it will
             lighting, elevation, dredging and numerous other needed   also upgrade ADA accommodations, narrow travel lanes
             improvements within the immediate area.                to convert the shoulder to a 4’ bike lane, upgrade traffic
                                                                    signals with pedestrian countdowns and update lighting at
             Due to several near misses, “Do Not Enter” signs were
             installed by the FDOT for the NE 55th Street exit lane.   intersections for improved pedestrian safety. A public meeting
             Hopefully these signs will help with the “errant entry” of   was held on September 7, 2022 by FDOT to share the design
             vehicles from North Federal Highway entering against   and receive comments on the project. The presentation link is
             oncoming traffic departing from The Landings community.  below. Construction is anticipated to begin in fall 2023.

         8                                             The Landings & Bay Colony



                                                                                                                    3/29/23   9:59 PM
        TLBC 0423.indd   8
        TLBC 0423.indd   8                                                                                          3/29/23   9:59 PM
   5   6   7   8   9   10   11   12   13   14   15